Fence from a grid height of 2.0m Section STANDARD Fence 4mm Standard 4mm 2x2.5m sectional fence 3d Fence nets - high quality welded fence section. Buy mesh for a fence of the Standard Color series with PVC coating RAL 6005, 7016, 7040 - fence nets in the warehouse ZSK manufacturer Ukraine SZS-02 Choose options
PRICE: 1. From the factory, without intermediaries! 2. Discounts for volume % 3. Promotions and sales - here 4. We cooperate: customers / contractors / designers 5. Expanding the dealer network
SHIPPING: 1. Pickup (right and left banks) 2. Kiev - from UAH 500. (14 UAH / km Region) 3. Ukraine "Nova Poshta", "Delivery", "SAT"
Optional color Standard color of products is green (RAL6005). A set is made on order in any color according to the RAL line. Most Popular: gray, brown, graphite, blue, yellow, red, etc ..
Design and install: - Sports grounds - Large turnkey perimeters (from 1 km) - Egoza safety barriers - Country mesh fences - Fencing of public places - Gates and wickets - Gate automation - Street lighting - Video surveillance
The specialists of our company carry out installation of sliding gates on a turnkey basis, with and without automation. Stage # 1 Selection of the necessary components: According to the technical requirements and actual measurements, we determine the required construction sliding gates and agree with the customer, after which we conclude contract, we define the terms, and we take the object into work. Stage # 2 Preparatory: Preparation for the installation of sliding gates mainly takes place away from the eyes of the client, the company's specialists prepare the necessary reinforcing structure, embedded and installation elements. During the construction of regional facilities, they additionally organize everyday life (change houses, warehouses, autonomous food, etc.) Stage # 3 Installation: Experts determine the heights, mark the installation site, dig the foundation for the gate (more than 1.2 cubic meters) and all the necessary elements. Pouring is done after the reinforcement is done and the necessary "embedded" is installed. After the foundation has been poured, it must settle, at least 3 days *, before you can start assembling the gate and installing the automation. * it must be remembered that the foundation will acquire maximum strength 21 days after pouring. Stage 4 Completion of the object: The masters remove the formwork, set the gaps, adjust the automation and start it up, after which they sign the delivery certificate with the client.
The preliminary cost of installation is calculated to the customer before the specialists get to the object, and is formed exclusively from the words of the client, in 95% of cases the amount of installation does not change, but there are exceptions when the customer does not know that the fence is being erected on a site with construction waste, etc., or in a forest plantation, in this case, the foremen perform soil development and drilling holes manually, which leads to an increase in the cost of the installation. We assert that installing fences is simple, and we do it quickly and efficiently!